Benut team on the Chemical program for the Indorama Trend-3 project at Indorama Petrochemical Eleme.
Successful maintenance of 9000m3 Propane Tank for Client by Benut Engineering.
Benut's newly assembled High-Pressure Electric-Driven Pump is available for mobilization.
Flushing of 16 x 18.5km NNPCL Pipeline from PHRC to Okrika
Benut Team at NNPCL facility(Okrika Jetty) for maintenance operations
Benut Team on Plant's Preventive Maintenance at Client's Facility
Benut's newly constructed high-pressure electric-driven pumps are readily available for mobilization
Benut team at the NNPCL/Amarata Facility at JONES CREEK for Produced Water Pumping operations
Maintenance of 9000M3 Propane Tanks for the client by Benut Engineering Ltd
Flushing of 16x18.5km NNPCL PIPELINE FROM PHRC TO OKRIKA
Installation of storage tanks, connectivity, and transfer pump at Ikeja - Rig at Nassarawa state